The following are archived documents from 2020. View current standards
Jump to a section
2020 Improvement Standards
Modifications and Additions
Section Number |
Section Title |
Approval Date |
5-8.B,5-8.H |
Street Light Design |
02/26/2021 |
12 |
Survey Monuments |
03/08/2021 |
2-17,4-8 |
Utilities, Sight Distances and Visibility Easement at Intersections |
06/21/2021 |
2-12A, 3-7F |
Record Drawings, Plan Details |
08/18/2021 |
All Applicable Sections |
Replaces the term "Engineer of Record" with "Consulting Engineer"
|
12/27/2021 |
4-4, 4-7, 4-9, 4-11, 4-14, 4-15 |
Streets |
03/02/2022 |
Improvement Standards by Section
Back to top
2020 Construction Specifications
Modifications and Additions
Section Number |
Section Title |
Approval Date |
6-16.04, 1-3 |
Underground Service Alert (USA)
Definitions |
11/20/2020 |
25-5 |
Portland Cement Concrete Pavement |
02/18/2021 |
27-3.01 |
Curbs, Gutters, Sidewalks, and Drainage Structures |
02/18/2021 |
49-2.10,
49-2.10A,
49-2.10B |
Signals, Lighting and Electrical Systems |
02/26/2021 |
46 |
Survey Monuments |
03/08/2021 |
5-9.04 |
Surveys |
03/08/2021 |
48-3 |
Placement |
06/21/2021 |
23 |
Asphalt Concrete |
08/18/2021 |
12-3 |
Traffic-Handling Equipment |
10/12/2021 |
14-6 |
Temporary Paving |
10/12/2021 |
19, 38, 49,50 |
Trench Excavation, Bedding and Backfill
Storm Drain Construction
Signals, Lighting and Electrical Systems
Construction Materials |
02/16/2022 |
All Applicable Sections |
Replaces the term "Engineer of Record" with "Consulting Engineer" |
12/27/2021 |
Construction Specs by Section
Back to top
2020 Standard Drawings
Modifications and Additions
Section Number |
Section Title |
Approval Date |
T-2 |
Traffic |
02/04/2021 |
2021-02 Standard UpdateL25 |
Landscaping |
02/18/2021 |
SD-13 |
Storm Drainage |
02/18/2021 |
AR-2.0, AR-3.0, AR-4.3, AR-4.5, AR-4.7, AR-4.8 |
Accessible Ramps |
02/26/2021 |
D-2 |
Drafting |
02/26/2021 |
G-1 |
Grading |
02/26/2021 |
SD-16 |
Storm Drainage |
02/26/2021 |
ST-20, ST-21B, ST-32 |
Street Lighting |
02/26/2021 |
T-6A, T-9A |
Traffic |
02/26/2021 |
SD-9 |
Storm Drainage |
02/26/2021 |
SL-3, SL-7,
SL-8, SL-9,
SL-20, SL-22, SL-30, SL-31, SL-40, SL-42, SL-46 |
Street Lighting |
02/26/2021 |
T-21, T-22 |
Traffic |
06/21/2021 |
ST-13, ST-14A, ST-14B, ST-15A, ST-15B, T-7 |
Streets, Traffic |
07/30/2021 |
ST-25,ST26.1 |
Streets |
08/18/2021 |
T-3, T-4 |
Traffic |
08/18/2021 |
SD-6.0, SD-6.1, SD-6.2, ST-1A |
Storm Drainage
Streets |
02/16/2022 |
ST-45 |
Streets |
03/02/2022 |
ST-23, ST-24, ST-25 |
Streets |
03/02/2022 |
Back to top
Standard Drawings by Section
Jump to a Section
Standard Drawings: Accessible Ramps
Back to Standard Drawings Menu
Standard Drawings: Drafting
Back to Standard Drawings Menu
Standard Drawings: Grading
Back to Standard Drawings Menu
Standard Drawings: Landscaping
Back to Standard Drawings Menu
Standard Drawings: Storm Drainage
Back to Standard Drawings Menu
Standard Drawings: Street Lighting
Back to Standard Drawings Menu
Standard Drawings: Stormwater Quality
Back to Standard Drawings Menu
Standard Drawings: Streets
Back to Standard Drawings Menu
Standard Drawings: Traffic
Back to top