Grant Line Road - Sheldon Area Precise Roadway Plan

Study Overview

The precise roadway plan will determine the preferred alternative for further environmental study proposing future widening of Grant Line Road to 4 lanes between Bond Road and Calvine Road. The precise plan will prepare a preliminary level design in accordance with the City of Elk Grove General Plan, Rural Roads Improvement Standards, and Southeast Connector JPA Design Guidelines.

Extensive coordination with community members will continue to advise the design, as well as the necessary comprehensive traffic analysis. No construction activity is planned as a part of the Precise Plan preparation.

The design of the 4-lane widening of Grant Line Road will identify necessary access modifications, intersection modifications, and the potential right-of-way needs for the future widening of Grant Line Road.

Conclusion of the study for the precise roadway plan can be used to guide future design efforts by the City and the Connector JPA.

Previous efforts by the City in conjunction with the Connector JPA have identified several varied configurations of roadway improvements, but with direct input from community members, this study will refine those ideas into one cohesive design direction that can be taken forward by the City and the Connector JPA, once the environmental review is completed.

For more information regarding the Capital Southeast Corridor, please see their website.

View frequently asked questions


Schedule

The study will include both public meetings and one on one meetings with local business owners and property owners. These meetings and discussions are crucial to the success of the study to discuss alternatives and refine access needs and impacts. 


Meetings

First Public Meeting

The first public meeting was held on September 17, 2020. Links to the presentation, project plans and a survey are below.

Second Public Meeting

The second public meeting was held on August 31, 2021. The presentation, project plans and comment card are available below:

Third Public Meeting

The third Grant Line Road Precise Roadway Plan Meeting was held via Zoom to provide displays of the Graybill Road and Bradley Ranch Road Alternatives and provide opportunity for feedback from the community.

Third Public Meeting:  Tuesday, March 1, 2022, 6:00 p.m. – 7:30 p.m. 

August 24, 2022 Council Meeting

On August 24, 2022, the City of Elk Grove City Council will receive an update on the Grant Line Road Precise Roadway Plan Study (Bond Road to Calvine Road) and the Council will consider staff recommendations and provide direction on the next steps. The Public Works Department of the City of Elk Grove invites you to participate and provide input at this meeting.

The Council meeting will begin at 6:00 pm and will be held in the Council Chambers, located at 8400 Laguna Palms Way across the street from City Hall. The Council agenda will be posted in advance of the meeting and will contain the staff report and staff presentation. View the agenda or watch the live-streamed meeting.


Contact Information

Contact

Project Manager

Christina Castro            
Email or (916) 842-1069