City of Elk Grove

Sign up for Email UpdatesElk Grove Community

Bid Results

2012

Bid No. Title Posted
.pdf file12-01 Heating, Ventilation & Air Conditioning (HVAC) Maintenance Services 01/05/2012

2011

Bid No. Title Posted
.pdf file11-17 Elk Grove Creek Pipe Outfalls (WDR004) and Dry Well Installations (WDR012) Drainage Improvements Projects 12/01/2011
.pdf file11-16 Neighborhood Livability (Speed Control) Improvement Phase 2 (WSC002) and 3 (WSC003) 11/01/2011
.pdf file11-15 Quail Run Lane and Bruceville Road Intersection Southwest Corner Improvements Project PT0112 10/13/2011
.pdf file11-12 Elk Grove Teen Center Retrofit Replacement Window Project 09/23/2011
.pdf file11-14 Old Town Stub (9070 Elk Grove Boulevard) Drainage Improvements Project WDR006 09/15/2011
.pdf file11-13 Asphalt Concrete Overlay & Rubberized Emulsion Aggregate Slurry Seal Project WPR002 09/07/2011
.pdf file11-11 Rain Garden Plaza Project WDR010 08/12/2011
.pdf file11-10 Citywide Bus Stop Improvements - Phase 1 PF014A 08/09/2011
.pdf file11-09 Markofer Elementary Pedestrian/Bicycle Trail Improvements Project 07/18/2011
.pdf file11-07 Elk Grove-Florin Road Pedestrian Improvements Project PT0132 07/14/2011
.pdf file11-08 Corporation Yard Expansion Project

     .pdf fileSubcontractor list

07/07/2011
.pdf file11-05 Neighborhood Livability (Speed Control) Project PT0077 05/19/2011
.pdf file11-06

Household Hazardous Waste Collection Facility (HHWCF) Roof Mounted Photovoltaic System Project

     .pdf fileNotice of Intent Award

05/17/2011
.pdf file11-03

Human Resources Tenant Improvements Project

     .pdf fileSubcontractor list

05/09/2011
.pdf file11-02 2011 LED Streetlight Conversion Project PT0083 03/25/2011
.pdf file11-01

Corporation Yard Warehouse Building Improvements 10250 Iron Rock Way Project

     .pdf fileNotice of Intent Award
     .pdf fileSubcontractor list

03/10/2011

2010

Bid No. Title Posted
.pdf file10-24 Whitelock Parkway Landscape and Pedestrian Improvements Project PT0087 10/08/2010
.pdf file10-23 Grant Line Road / State Route 99 Interchange and Sheldon Road /State Route 99 Interchange Landscaping Project PT009L and PT010L 09/29/2010
.pdf file10-22 Williamson Drive Sidewalk Project PT0133 09/24/2010
.pdf file10-21 Library South Stair Refurbishment Project 09/09/2010
.pdf file10-21 Public Works Services 08/23/2010
.pdf file10-20 Harbour Point Rehabilitation Project PT0131 08/12/2010
.pdf file10-19 Promenade Mall Detention Basin Flap Gate Installation Project PD0006 08/05/2010
.pdf file10-17

Police Reorganization Tenant Improvements Project 8380 - 8400 Laguna Palms Way

     .pdf fileNotice of Intent to Award
     .pdf fileSubcontractor list

08/04/2010
.pdf file10-18 Slurry Seal 2010 Project PT0116 07/15/2010
.pdf file10-16 East Franklin Area Roadway Improvements Project PT0112 07/08/2010
.pdf file10-15 Waterman Road Re-Alignment Project PT0080 06/25/2010
.pdf file10-13 East Stockton Boulevard / Sheldon Road Park and Ride Lot Landscaping Project 06/17/2010
.pdf file10-14 Bond Road at East Stockton Boulevard Median Island Improvement PT0107 and Elk Grove Boulevard at Laguna Springs Drive Median Island Improvement PT0119 Projects (RE-BID) 06/17/2010
.pdf file10-11 Poppy Ridge Intelligent Transportation Systems (ITS) Project PT0111 05/17/2010
.pdf file10-12 Bond Road at East Stockton Boulevard Median Island Improvement PT0107 and Elk Grove Boulevard at Laguna Springs Drive Median Island Improvement PT0119 Projects 05/14/2010
.pdf file10-10 Asphalt Concrete Overlay and Curb Ramp Improvements Project PT3510 and PT5810 05/04/2010
.pdf file10-08 Elk Grove Corporation Yard Elkmont Way Entrance Improvements Project PF0017 04/29/2010
.pdf file10-07 Elk Grove-Florin Road/Brown Road-Silverberry Avenue Traffic Signal and Intersection Improvements Project PT0091 04/22/2010
.pdf file10-09 Street Sweeping Maintenance Services 04/02/2010
.pdf file10-06 Grant Line Channel Restoration Project PD0003 04/01/2010
.pdf file10-05 Elk Grove-Florin Road Pavement Rehabilitation Project PT0101 03/25/2010
.pdf file10-04 Franklin Boulevard/Elk Grove Boulevard Intersection and Bus Turnouts Widening Project PT0001 03/17/2010
.pdf file10-03 Stonebrook Drive Pedestrian/Bicycle Trail Improvements Project PT0108 03/05/2010
.pdf file10-02 Poppy Ridge Street Light Retrofit Project PT0106 02/25/2010
.pdf file10-01

City Hall and Library Flagpole Project

     .pdf fileNotice of Intent to Award

02/01/2010

2009

Bid No. Title Posted
.pdf file09-14 East Franklin ITS and Traffic Signal Improvements and East Franklin Pedestrian Crossing Improvements PT0093 and PT0094 10/22/09
.pdf file09-13

CDBG Accessibility Curb, Gutter and Sidewalk Improvements Project PT0097

     .pdf fileNotice of Intent to Award

10/13/09
.pdf file09-12

Intelligent Transportation Systems (ITS) Phase 1C Project PT0057

     .pdf fileNotice of Intent to Award

09/17/09
.pdf file09-11

I-5/Elk Grove Boulevard Northbound On-Ramp Project PT0086

     .pdf fileNotice of Intent to Award

08/06/09
.pdf file09-10

Franklin Boulevard, Wilton Road & Kammerer Road Pavement Rehabilitation Project PT0100

     .pdf fileNotice of Intent to Award

07/24/09
.pdf file09-09

City Hall Tenant Improvements Project - 8401 Laguna Palms Way

     .pdf fileSubcontractor list

07/15/09
.pdf file09-08 Police Fence Project - 8380 Laguna Palms Way 07/15/09
.pdf file09-07 Slurry and Chip Seal 2009 PT0098 07/15/09
.pdf file09-06 Harbour Point Drive Median Improvements (Renwick to Maritime) Project PT0092 07/15/09
.pdf file09-05 CANCELLED Grant Line Channel Restoration Project PD0003 07/15/09
.pdf file09-04 Asphalt Concrete Overlay Project 2009 PT3509 and PT0096 04/07/09
.pdf file09-03 Franklin Boulevard Rehabilitation Project (Elk Grove to Laguna) PT0095 03/31/09
.pdf file09-02 Elk Grove Boulevard Rehabilitation Project (Franklin to Bruceville) PT0068 03/17/09
.pdf file 09-01 West Stockton Boulevard Bridge Replacement Over Laguna Creek Bridge PT0033 02/17/09

2008

Bid No. Title Posted
.pdf file08-15 Sheldon Rd/SR 99 Interchange Zone 2 Electroliers Project 08/19/08
.pdf file08-14 Slurry and Chip Seal Project 2008 08/07/08
.pdf file08-13 Asphalt Concrete Overlay & Curb Ramp Improvements 2008, PT3508 & PT5808 07/08/08
.pdf file08-12 CDBG Bus Stop Improvements Project (PF0015) 07/22/08
.pdf file08-11 Compressed Natural Gas (CNG) Temporary Fuel System 07/03/08
.pdf file08-10 Elk Grove Boulevard/Elk Grove-Florin Rd Intersection Improvements Project PT0063 07/08/08
.pdf file08-09 Signage for Elk Grove Old Town Library Project 07/03/08
.pdf file08-08 Micro-Surfacing and Chip Seal Project 2008 (PT0082) 06/24/08
.pdf file08-07 Elk Grove Boulevard Median and Widening Improvements (PT0040, PT0032, and PT0028) 06/03/08
.pdf file08-06 Safe Routes to School - Laguna Creek Pedestrian Bridge Project PT0065 05/20/08
.pdf file08-05 Elk Grove Elementary Safety Improvement Project PT0065 04/29/08
.pdf file08-04

Elk Grove (Old Town) Library Project

     .pdf fileSubcontractor list

03/11/08
.pdf file08-03 East Stockton Boulevard Bikeway Project PT0025 02/26/08
.pdf file08-02 Franklin Boulevard / Percheron Drive and Franklin Boulevard / Blossom Ridge Drive Signal Upgrade Project PT0079 02/19/08
.pdf file08-01 Stockton Boulevard Rehabilitation Project 02/12/08
.pdf file07-08 Intelligent Transportation Systems Phase 1B Project 11/13/07
.pdf file07-07 Sheldon Road / State Route 99 Interchange Reconstruction Project Number: PT0010 10/23/07
.pdf file07-06 Elk Grove Florin Road / Campbell Road Intersection Improvements and Franklin Boulevard / Willard Parkway Intersection Improvements 09/18/07
.pdf file07-05 Sheldon Interchange Demolition Project 05/30/07
.pdf file07-04 Asphalt Concrete Overlay and Curb Ramp Improvements Project 2007 PT3507 04/17/07
.pdf file07-03 Harbour Point Drive Improvements Project PT0020 04/17/07

 

.pdf fileClick here to download reader.

Last updated: 1/5/12 5:06 PM

Site Map | ADA Compliance | Disclaimer | Privacy Statement | Webmaster | Home

City of Elk Grove . 8401 Laguna Palms Way . Elk Grove, California 95758 . 916.691.2489 (CITY) . Fax 916.691.2001