COVID-19 We're open, but City Hall building access is controlled. A face covering is required. Try us online first! COVID-19 Updates
Development within the Southeast Policy Area shall conform to the infrastructure plans prepared as part of the Strategic Plan. These include the following:
© 2021 City of Elk Grove | All Rights Reserved. Privacy Policy